Understanding MIRR (Modified Internal Rate of Return): Why It Is More Accurate Than Standard IRR
JULIZAR Advisory Team · · 2 min read
In capital budgeting, the Internal Rate of Return (IRR) is one of the most popular metrics. Yet finance professionals know it has a fundamental weakness: it often paints an overly optimistic picture of profitability.
The Modified Internal Rate of Return (MIRR) closes that gap with a more realistic calculation, which makes it a valuable tool for project managers and property investors.
What Is MIRR?
MIRR measures the attractiveness of an investment. It refines IRR by assuming that cash inflows are reinvested at a different, more realistic rate.
Why Standard IRR Falls Short
- Unrealistic reinvestment assumption. IRR assumes every unit of cash a project generates is reinvested at the IRR itself. With a 40% IRR, it assumes you can earn another 40% on the proceeds, which is very hard to find in practice.
- Multiple IRRs. When a project has a large outflow mid-way (for example a major renovation in year 3), the IRR equation can return two different rates, which confuses the decision.
How MIRR Works
MIRR uses two explicit rates:
- Reinvestment rate: the rate at which inflows are expected to be reinvested, usually the cost of capital.
- Finance rate: the rate paid on the capital borrowed to fund the project.
The MIRR Formula
- n: number of periods.
- FV: future value of the reinvested inflows.
- PV: present value of the capital outlay.
In Excel: =MIRR(values, finance_rate, reinvest_rate)
IRR vs MIRR
| Feature | IRR | MIRR |
|---|---|---|
| Reinvestment assumption | Reinvested at the IRR | Reinvested at the cost of capital (more realistic) |
| Accuracy | Often overstates returns | More conservative and realistic |
| Result | Can return several rates | Always a single, unique rate |
Decision Rule
- MIRR above the cost of capital (WACC): the project is feasible.
- MIRR below the cost of capital (WACC): the project is not feasible; the money is better placed elsewhere.
A Simple Example
A property project needs Rp1 billion upfront, shows a 25% IRR, and the market reinvestment rate is 10%. IRR suggests your money grows 25%, but rental proceeds can only be reinvested at about 10%. MIRR may come out near 16%, a more honest figure for a long-term decision.
Conclusion
MIRR is a more refined navigation tool than IRR and removes the bias of blind optimism. When preparing a feasibility study or an HBU analysis, reporting MIRR next to IRR strengthens the credibility of your report with professional investors.
Have a project to assess?
Tell us about your plan. Free initial consultation, Monday to Friday 08:30 to 17:00 (WIB).
Consult via WhatsApp